Top good articles

Handing over Prefabricated House in Binh Duong

  • 04/11/2022
  • Prefabricated houses are the choice of many people living and working in Binh Duong today. With reasonable cost, fast construction time, guaranteed certainty and still full of utilities... this project helps every family have a long-term quality residence. Prefab prefab house in Binh Duong and the most detailed information will be in the article below.

    GENERAL INFORMATION ABOUT THE PROJECT

    About Binh Duong province

    According to statistics, each year the population in Binh Duong increases by about 20,000 people, of which immigrants account for more than 50% of the province's total annual increase. The population is increasing day by day while the number of houses and apartments is not enough to meet the demand, which is the reason why many people find it difficult to buy a house. This is also the reason for more and more intelligent prefabricated houses. Help people get a place to settle quickly.

    Building prefab houses is chosen by many people because it brings practical benefits such as:

    - Fast construction time only from 2-10 days depending on the area and type of steel frame house you choose.

    - Made of high-quality materials, with heat resistance, good fire resistance and high durability.

    - Can be dismantled, transported to another location and continued to be reused.

    - In addition to being used as a house, prefabricated houses can also be converted into offices, factories...

    - Reasonable cost suitable for many customers.

    CUSTOMER'S NEED

    Mr. TV Dung is a worker at Song Than I Industrial Park in Di An Ward, Di An City, Binh Duong Province. He chose an assembly house because he couldn't find an apartment suitable for his living needs. The criteria for the apartment is a solid 2-storey house, fully equipped, durable, with balcony space and good waterproofing.

    CATEGORY OF CONSTRUCTION HOUSE IN BINH DUONG

    - Category: Prefab house in Binh Duong

    - Customer name: Anh TV Dung

    - Design and construction unit: Hoang Sa Viet Construction

    - Construction site: Binh Duong province

    - Construction structure: 2-storey steel frame house with an area of ​​​​4x6m2

    - Implementation time: 7-10 days.

    - Indoor electrical system: LED lights, sockets, CB, wiring

    - Materials: Frame, Panel, 2-layer roof, floor, doors, electrical system.

    - Warranty period: 10 years

    PROJECT CONSTRUCTION

    The construction site of the compound house for Mr. Dung is located near Song Than I Industrial Park and he is preparing to get married, so using a 2-storey prefab house with an area of ​​​​4x10m2 is the most reasonable. Not only is it convenient for relocation when required by government agencies, but the area is also just enough for him and his family to live comfortably and spaciously.

    The foundation of the house is poured with 2 layers of concrete combined with solidly reinforced iron beams, surrounded by load-bearing columns to help fix the whole house frame. Underneath the floor is an 18mm thick Cement Board that is water resistant and has a large load capacity. The entire frame of the house uses 2.5mm thick U160mm steel with good bearing capacity and static electricity. Ensure absolute safety, especially in the erratic rainy and sunny weather conditions of the southern region.

    The space on the side of the 2-storey prefabricated house

    The roof is covered with two layers of heat-resistant rock wool, 40mm thick. Separating the 2 floors is a flat ceiling of 2.5mm thick powder-coated corrugated aluminum material. These are all high-quality materials to increase the durability of the house during use.

    The main facade of the 2-storey prefabricated house

    Partitions use standard Panel panels with a thickness of 50mm; With rockwool glass wool structure in the middle, it provides almost absolute insulation and fire resistance. Aluminum doors and windows provide high durability; combined with glass glass to help the house become airy, and at the same time catch the sun and wind inside, saving energy.

    The side of the 2-storey prefabricated house is installed with full glass doors

    After completing the construction of the pre-assembled prefabricated house for Mr. Dung, the construction team will proceed to equip the basic electrical system with: LED bulbs, CBs, electrical outlets, wiring, electrical braces and tables assigned to take over the project.

    In addition to the 2-storey prefabricated house model in Binh Duong with a total area of ​​40m2, Hoang Sa Viet Construction also has many other beautiful prefabricated house solutions for customers to choose from such as: Steel frame house with an area of ​​​​4x6m2, prefab house with an area of ​​​​4x6m2. 4x18m2 area, prefabricated house... Depending on the needs of the customer and the implementation location, we will advise specifically. Please contact the hotline of Hoang Sa Viet Construction immediately for support.

    870 views
    0779025789