Prefabricated Factory In Hau Giang

  • 02/12/2022
  • BUILDING PRIVACY FACTORY

    Today's manufacturing enterprises in Vietnam are making drastic changes. They develop application technology for the production of goods to infrastructure such as machines, warehouses, and factories. Currently, many businesses have known and applied the construction of pre-engineered factories and pre-engineered warehouses. There are many reasons that they choose this new model to replace the traditional factory form. They found that the prefab factory has more advantages such as:

    Prefabricated workshops are light in weight, only 1/2 the weight of reinforced concrete workshops. Because of this feature, the prefabricated factory is easy to disassemble, easy to move, easy to expand according to development needs. The steel frame structure of the pre-engineered factory is easy to reuse, avoiding the construction of dust and pollution. There is a quick construction time, high efficiency in optimizing the arising construction costs. However, it still ensures safety when using, long life.

    Prefabricated factory in Hau Giang
    Prefabricated factory in Hau Giang

    SO WHAT IS THE NATURE OF THE PRIVACY FACTORY? WHY CUSTOMERS CHOOSE TO CONSTRUCTION PRECAUTION FACTORY?

    The prefabricated factory, also known as the steel frame factory, is a model built according to a new and different solution than the traditional factory model entirely made of reinforced concrete. The structure of the pre-engineered factory is made entirely of steel, made of pillars, trusses, and purlins manufactured at the steel structure factory according to pre-designed drawings.

    Hau Giang currently has 8 administrative units, including: Vi Thanh City, Nga Bay City, Long My Town, Phung Hiep District, Long My District, Vi Thuy District, Chau Thanh District, and Chau Thanh A District. there are many industrial parks, large and small industrial clusters. With the average operating area in Hau Giang being quite large, the construction of the infrastructure will take a lot of time and investment costs. Therefore, Hoang Sa Viet's customer decided to build a pre-engineered factory when seeing the outstanding properties of this model.

    Prefabricated factory in Hau Giang
    Inside the pre-assembled factory in Hau Giang

    GENERAL PROJECT INFORMATION

    • Category: Prefabricated Factory

    • Client's name: Mrs. Nguyen Ngoc Anh Dao

    • Design requirements: The investor requires the construction of a prefabricated factory with a large area, basic structure but must achieve the best quality. Install more windows.

    • Location: Hau Giang.

    • Scale of area: 3626 m2.

    • Completion time: 10 days.

    • Warranty: 10 years.

    PROCESS OF DESIGN AND CONSTRUCTION FACTORY IN HAU GIANG

    The process to complete the prefabricated factory in Hau Giang includes 3 stages:

    Stage 1: Design and make detailed drawings. Make the most optimal construction plan, suitable for the installation location.

    Stage 2: Fabrication of components. This is the stage that will be carried out at the factory, made according to detailed drawings. Ensure the quality of the welding seam, the best paint layer to limit the influence from the environment.

    Stage 3: Completion of erection at the construction site. Construction time will take place quickly when the components are ready.

    Structural Prefabricated FACTORY IN HAU GIANG

    The structure of the pre-engineered factory is made from the main parts of the foundation structure system, the factory floor, the main structural frame system, the skylight, the roof, the purlins, the bracing system and the covered corrugated iron roof. For firm fixation, the load from the top to the bottom will use a reinforced concrete system. The foundation is exchanged concrete to the base layer and compacted sand. Components of the main frame system of the workshop are designed in an H-shape, linked together by ciphertexts and bolts. Above the covered corrugated iron roof, there is an additional layer of insulation that has the effect of heat and sound insulation. The outside will use thermal paint. The color of the factory is stylized, interwoven with many color blocks to create a new and modern feeling.

    Prefabricated factory in Hau Giang
    Prefabricated factory in Hau Giang
    Prefabricated factory in Hau Giang
    Inside the pre-assembled factory in Hau Giang

    Hoang Sa VIETNAM CONSTRUCTION

    663 views
    0907.090.551